top of page

THE FORTIS PILE ADVANTAGE

Tiebacks Complicate Projects

 

The traditional soldier pile shoring design has some drawbacks:

  • Attaining easement space on certain projects can be difficult

  • Corrosion in the soldier pile walls from water leaks at the joints

  • Working around struts and raking beams

 

 

Fortis Pile Shoring Design

 

Avoid complications by using the Fortis Pile Shoring Design:

  • No tiebacks

  • No struts

  • No raking beams

  • No corrosion

  • No easement space needed

 

As seen in the photos below, the Fortis Pile Shoring Design eliminates ALL complications and hassles of soldier pile projects with this simple, easy to execute design that works better.

Original Shoring

Design

Fortis Pile

Shoring 

Design

bottom of page